Flowco Australia provides specialist installation testing services for new fuel system installations, ensuring tanks, lines, and associated fuel infrastructure meet compliance and safety standards from day one. Our precision testing methods verify system integrity under both wet and dry conditions, detecting even the smallest leaks before the site goes live.
Pre-bury testing plays a critical role in ensuring the long-term integrity of a new fuel system. By conducting testing before tanks and lines are backfilled, any leaks can be identified at a stage when they are straightforward and cost-effective to repair. This proactive step prevents hidden issues from being buried beneath concrete or soil, where repairs would become significantly more complex and expensive. Post-bury testing then provides final assurance that the system has remained leak-free after installation, confirming compliance and giving confidence that the site is safe and ready for operation.
Post-bury testing is just as vital, as it ensures that no damage has occurred during the backfilling process and that the system remains fully intact before commissioning. This stage confirms that tanks, lines, and connections have not been compromised by settlement, compaction, or handling during installation. Just as importantly, post-bury testing verifies compliance with Australian standards such as AS1940, giving regulators, contractors, and site owners the assurance that the installation meets all legal and environmental obligations before fuel is introduced.
Choosing Flowco Australia for your installation testing means safeguarding your investment, preventing costly delays, and achieving full environmental compliance with confidence.
Read more: Pre and Post Bury Installation Tank Testing